Forum quick links
Wood Ceilings & Walls in EQc2
NC-v4.1 EQc2:Low-Emitting Materialsposted by Jerome Burrowes on
From what I have seen on other threads in this forum, wood ceilings & walls (tiles, slats, planks, panels, etc.) are expected to comply to CDPH.
Exception for Constant Volume HVAC system in ASHRAE 90.1-2010
NC-v4 EAp2:Minimum energy performanceposted by Joel Rothenberg on
Hello All,
Baseline Energy Source for Electric only Building energypro
NC-v4 EAp2:Minimum energy performanceposted by Mike Magee on
A bit of a newbie to LEED stuff, but does anyone know how to make the baseline energy source electric in stead of gas?
Interior Access Doors and Frames
posted by Suchit Patel on
Hello Everyone,
Group Project Scoring
EBOM-v4 EAc7:Renewable energy and carbon offsetsposted by Andy Rhoades on
How do I score EAc7 when certifying for a group project? I have the VER proposals for the three buildings but don't know how to score them together. Thanks!
Remediation of LEED Project Area or only disturbed areas
NC-v4 LTc3:High priority siteposted by Mark Meaders on
We have a project that has had a Phase 1 and II ESA performed. It found there was acetone and mercury on site.
EV Charging Stations
NC-v4 LTc8:Green vehiclesposted by Dianne Herrin on
Hello - My client is preparing to purchase Tesla EV charging stations to meet LEED v4 requirements. These stations will work only with Teslas.
Renewable Energy - Confirmation of Renewable Attribute Ownership
CS-v4.1 EAc5:Renewable Energyposted by Levi Jimenez on
We have a site with a substantial solar array that is owned by the building owner. The LEED Credit form requires uploaded supporting documentation as follows: "upload confirmation
Option 2 Strategy E for an Atrium area - No ceiling areas (Open to roof deck above)
NC-v4 EQc6:Interior lightingposted by John Covello on
Hello.
For Option 2, Strategy E.