Forum quick links
Building Performance Factors
CS-v4.1 EAc2:Optimize Energy Performanceposted by Michael Brown on
Per Table 2.4 Building Performance Factors (BPF) for Complaicne with Standard 90.1-2016, if you have a mixed use building I assume that you would use the weighted averge (based on GSF) of each majo
USGBC's commentary "Product Replacement via EPDs optimization"
NC-v4.1 MRc1:Building Life-Cycle Impact Reductionposted by jaclyn lee on
We got a comment back from USGBC that said this:
Historical building and Existing building part of connected structure
NC-v4 MRc1:Building life-cycle impact reductionposted by Edgar Arevalo on
I have courthouse project that involves two existing buildings being connected with a newly constructed third building. Since one of the existing buildings connected to the third one is class
WEc Water Metering
NC-v4 WEc4:Water meteringposted by Theresa Lehman on
I am working on a homeless shelter project with three large water uses: kitchen, laundry, bathrooms (toilets, sinks & showers) where toilets are on cistern water.
IDc1.3 : Safety First: Cleaning and Disinfecting Your Space
posted by Carlos Sanchez on
I am struggling with finding the green cleaning criteria for this credit. Any help would be greatly appreciated.
Indoor Water Use Calculator malfunction
NC-v4 WEp2:Indoor water use reductionposted by Susan Di Giulio on
Dear LEED friends,
It seems there is a glitch with the Calculator and Excel. Has anyone had the error on the Summary page show up, "Run time error '1004'?
How do you calculate the %?
Pilot-Credits IPpc81:Green training for contractors, trades, operators and service workersposted by Russell Davison on
Hi All,
Ordinance says no new minimum parking needed for Parks
NC-v4 LTc7:Reduced parking footprintposted by Akshaya Bhaskar on
We are currently working on a 4000 sq ft park shelter project located in an existing park in Madison, Wisconsin.
Commercial Washer and Dryer requirements for NC- K12 project, LEED v4
NC-v4 EAp2:Minimum energy performanceposted by Divya Shroff on
We are looking to specify a commercial washer dryer for a high school project. The LEED requirement for a commercial washer is atleast 120000 lbs for laundry per year.
Process Water and Energy
EBOM-v4.1 WEc1:Water Performanceposted by Summer Gorder on
I am working for a semi-conductor company that would like to pursue LEED EBOM for their manufacturing building that is postly clean rooms and labs.