Forum quick links
Points in Addition to Renewable Energy Production?
NC-v4 EAc2:Optimize energy performanceposted by Dianne Herrin on
Hi - Our solar PV system is adding two points to our "optimize energy performance" category due to the cost offset.
Frit Pattern
Pilot-Credits SSpc55:Bird collision deterrenceposted by Chelsea Miller on
Is having a frit pattern necessary if you have a really low ratio of glass to opaque surface?
Electrical Commissioning Scope
NC-v4 EAp1:Fundamental commissioning and verificationposted by Renee Azerbegi on
We have several clients who are implementing LEED v4.
Indoor Lighting Quality in LEED v4 BD+C Hospitality projects.
Hospitality-NC-v4 EQc6:Interior lightingposted by Susan Di Giulio on
Hi,
I have a few hotels working their way through LEED v4. I understand that Guestrooms should not be counted for Option 1; lighting controls.
Additional scope to test...what if there is no contamination found?
NC-v4 LTc3:High priority siteposted by emily reese moody on
We have a project that is not required to do site contamination testing, and does not believe there is any reason for the site to have contamination (they have always owned the site), so they did n
Clarification Re. General Emissions Requirement for Multi-part Acoustical Wall Treatment
NC-v4 EQc2:Low-emitting materialsposted by Vanessa Nelson on
We have a project with sound recording studios with drywall throughout and an acoustical wall treatment that will be assembled on site and attached to select portions of the drywall.
Industry-Wide EPD - error in description?
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Megan White on
Hi all, In the ref guide (p.514), it states that as part of Industry Wide EPD "the manufacturer is explicitly recognized as a participant by the program operator." However, this is the same exact
v2009 - SSc1: Site Selection - Wetland Protection
NC-2009 SSc1:Site selectionposted by Kathy Hrabovsky on
Is a Category 1 Forest Conservation Easement permitted to protect the limits of disturbance between a project site and an existing wetland if the project site is 60', instead of 100', from a wetlan
Uplight - lumens emitted above horizontal
NC-v4 SSc6:Light pollution reductionposted by Amanda Cunningham on
Can anyone clarify if the maximum allowed percentage of total lumens emitted above horizontal (by lighting zone) is applied to each individual luminaire or the sum of all lumens from all luminaires
Where to look for manufacturer documentation
NC-v4 EQc2:Low-emitting materialsposted by Lissa Spitz on
Is it just me? I'm having a hard time finding manufacturer documentation that confirms compliance with CDPH, aqBB, etc.