Forum quick links
WaterSense products
NC-v4 WEp2:Indoor water use reductionposted by Susan Di Giulio on
As more categories of plumbing fixtures have WaterSense certification standards, is LEED expanding what items need to have this certification for the Indoor Water pre-req and credit in LEED v
Freight Village Intermodal Transportation
Warehouses-NC-v4 LTc4:Surrounding density and diverse usesposted by Parker Hall on
The credit language for the LEED v4 LT credit: Surrounding Density and Diverse Uses, Warehouses & Distribution Centers, option 2 lists "freight village with intermodal transportation" as a poss
Exclusion of a multi story parking garage from energy model
NC-v4 EAp2:Minimum energy performanceposted by Jeff Wiedmeyer on
Meeting Option 2 Requirements
CI-v4 EAc3:Advanced energy meteringposted by Bonny Gray on
Below are the construction review comments from our reviewer:
Option 2: Advanced Metering
IEQp2 – ETS Control: Tracer Gas Testing as an Alternative to Blower Door Testing
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) controlposted by on
Hi, we are having issues passing our blower door tests and have been presented with the alternative compliance path below, does anyone have experience with this approach?
Integrated dryer and Water Sense labeled faucet
NC-v4 WEp2:Indoor water use reductionposted by Elizabeth Floyd on
If none of the systems with integrated sink/faucet and hand dryer are available with a Water Sense labeled faucet, does that make the product ineligible for Water Sense labeling?
Representative Measurements
CS-v4 EQc4:Daylightposted by Summer Minchew on
Similar to how we would address views in a core and shell project, can Option 3 measurements be conducted based on a representative floor plan(s) or would measurements need to be conducted for the
Add EAc6 Green Power AFTER Appeal?
posted by James Keohane on
Project has earned 51 points( NC 2009) and includes an award of 2 points for EAc1 Optimize Energy. Project is at D&C Construction Final Review Decision milestone.
Bird collision threat factor for unlisted materials
Pilot-Credits SSpc55:Bird collision deterrenceposted by Jay R on
Hello,
Accept or Appeal
posted by Jeannie Rueter on
We've received our final Design Review but want to add a design credit and correct a credit that was denied.