Forum quick links
FTE for Assisted Living Facility
NC-v4 WEp2:Indoor water use reductionposted by on
I am working on a 99 room/6 story assisted living facility in Newport Beach, CA. The LEED-BD&C v4.0 Reference Guide provided fairly straightforward instructions for determining the "
v2009 recycled content ranges for steel (BOF / EAF)
NC-2009 MRc4:Recycled contentposted by Lou Niles II on
I am curious to revisions and changes that may be present for LEED version 2009 with Steel manufacturers that claim their products are a Mix of BOF and EAF processes.
Land Trust Alliance Alternative
NC-v4 SSc2:Site development - protect or restore habitatposted by Ashley Wisse on
The project is on a campus that contains a large bird sanctuary that is managed by the Owner, which is open to the public for passive recreation. This wildlife sanctuary is not part of the La
Green Cleaning policy pilot credit
Pilot-Credits IPpc88:LEED O+M Starter Kitposted by Brightworks Sustainability on
I am unable to find the Green Cleaning Policy Pilot Credit, under ID+C: CI. How do I register for this credit?
SMart certfication vs Floorscore
NC-2009 IEQc4.3:Low-emitting materials - flooring systemsposted by Alicia Ravetto on
Will SMaRT certification for a Forbo linoleum flooring be accepted vs Floorscore certification?
Site Area Question
NC-v4.1 SSc5:Heat Island Reductionposted by Catherine Blakemore on
I noticed in the LEEDuser commentary that the credit calculations need to include parking outside the LEED project boundary. Does this addition area get added to the area to of the LE
Minimum IAQ performance LEED CI v4
CI-v4 EQp1:Minimum indoor air quality performanceposted by Donna Juselis on
Credit states "Monitoring Mechanically ventilated spaces For mechanically ventilated spaces (and for mixed-mode systems when the mechanical ventilation is activated), monitor outdoor air intake fl
Baseline for Manufacturing facility energy usage...
NC-v4 EAc2:Optimize energy performanceposted by Rick Alfandre on
We are dealing with a manufacturing facility that has energy intensive process loads. Is there a standard way to establish a base case for manufacturing process loads?
pursuing Renewable Energy and Green Power with the v4.1 credit substitution path
NC-v4 EAc5:Renewable energy productionposted by Cindy Quinn on
I am working on a v4 project that is about to submit for final construction review. We must reach Gold and are right on the threshold, going in with 62 points, if all are earned. We don
Exterior walk-off mats permitted?
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Vince Briones on
Hi- has anyone gotten verification on whether exterior walk off mats are permitted under v4? The reference guide and current addenda are silent on that detail.