Zones served by mutli-zone unit but is exhausted separately
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Edgar Arevalo on
This may be nothing, but should I still count for zones that are served by a multizone unit but the ventilated air is not recirculated back to the unit? The air is pretty much exhausted throu
RCI Visual Inspections - STILL???
NC-v4.1 MRc5:Construction and Demolition Waste Managementposted by Kimberlee Ilardi on
We have a project that is using a Certified Commingled Recycling Facility for their single-stream recycling and they are giving us visual inspections, with a breakdown of each waste strea
Exterior Noise Control
Pilot-Credits EQpc57:Enhanced acoustical performance - exterior noise controlposted by Alan Burt on
This project had several challenges related to exterior noise, it is in a busy area near downtown and at the time exposed to higher than typical noise levels from the exhaust system serving an unde
VOC/Emissions documentation for Casework/Millwork
CI-v4 EQc2:Low-emitting materialsposted by Tracy Marquis on
I am looking for some clarification pertaining to the VOC and emissions requirements for Casework and Millwork.
LEED Documentation /Back Up
NC-2009 MRc5:Regional materialsposted by Heather Young on
I have been recently told that I need more proof on the distance of the Steel Mill to the job site to justify regional materials.
Structural composite wood and moisture resistant adhesives - compliance and supporting documentation
NC-v4.1 EQc2:Low-Emitting Materialsposted by Esther Ma on
Hello LEED User community,
O+M Table of Contents requirement for v4 Fundamental commisioning
CI-v4 EAp1:Fundamental commissioning and verificationposted by Robert Fernandez on
I provided our primary LEED review with all of the following individually as each has its own upload to meet the intent of the credit but am being requested for an O+M table of contents for Fu
LEED for Homes with Exterior Energy Uses- Prescriptive
Homes-v4 EAc1:Annual energy useposted by Angela Loughry on
I am working on a home that has significant energy uses not in a HERS rating - exterior pool and snowmelt. I understand that you can go Option 1 under annual energy use. What is unclear
Innovation Credit: Walkable Project Site
CI-v4 INc1:Innovationposted by Patty Lloyd on
The base building achieved this, which was seeking LEED v3 CS. At that time it was pilot credit SSpc14.