Forum quick links
LTc5 Quality Transit - is and exemplary performance path avaiable?
CS-v4.1 LTc5:Access to Quality Transitposted by Susan Di Giulio on
We have a LEED-CS project adjacent to a major regional transit hub and it is actually possible that we could double the 360 wkday trips/216 wkend trips required for 6 points.
Option 2 - Is there still a minimum sample area requirement?
NC-v4 EQc4:Indoor air quality assessmentposted by Daniel Smith on
I am quoting to provide Option 2 IAQ testing for my first V4 BD+C project.
Renewable Energy production
posted by Ruju Rathod on
We are working on an individual building within a campus. A parking structure will have solar panels.
Can our building apply for points under Renewable Energy Production if,
Reduced Parking Footprint Opt 4 - Unbundling Parking
NC-v4.1 LTc7:Reduced Parking Footprintposted by Rebecca Mann on
New options were introduced in v4.1 for LT Reduced Parking Footprint.
Biophilia and Renovations
Pilot-Credits EQpc123:Designing with Nature, Biophilic Design for the Indoor Environmentposted by Vanessa Hostick Rempe on
Are there any metrics available based on case studies for the pilot credit or related WELL criteria that venues or spaces which renovate using the biophilia concepts rent quicker or have a greater
Emissions Documentation
NC-v4.1 EQc2:Low-Emitting Materialsposted by alix fox on
There are several materials in my calculator for which I have VOC information, but I cannot find a GreenGuard Certificate- are there other resources or documents available to help meet the criteria
LEED-BD+C Hospitality - MRc5 Option 2 for a modular building.
NC-v4 MRc5:Construction and demolition waste managementposted by Susan Di Giulio on
Our project is a hotel for which all guestrooms are being manufactured as modular units. This will certainly save waste, and we are interested in pursuing Option 2.
Post-consumer recycled content vs pre-consumer recycled content - LEED V3 excel datasheet
NC-v4.1 MRc4:Material Ingredientsposted by Mateus Souki on
I am working on a project where I must choose the materials for the MRc4 credit - LEED V3 (gold certification).
Whether or not to include certain existing fixtures within the area of work
CI-v4 WEp1:Indoor water use reductionposted by Bo White on
Our area of work includes portions of the first and second floors of a university library in California. On the first floor, only bathrooms are included.
Occupant Comfort Survey
NC-v4 INc1:Innovationposted by Leanne Conrad on
Is there a minimum duration after occupancy you must wait to conduct the occupant comfort survey?