Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Option 3 flexible lighting control system required documentation

CI-v4 MRc2:Interiors life-cycle impact reduction
posted by  Alara Brinton  on 

I'm not entirely sure what the LEED online form/template means in regards to calculations for flexible lighting control system.

3
Thu Sep 26, 2019, 9:21 am

Water Restoration Certificates

Pilot-Credits WEpc110:Water Restoration Certificates®
posted by  Renee Azerbegi  on 

This is a straight forward pilot credit with benefits beyond the project boundary to various watersheds. I recommend projects pursue it.

1
Fri Feb 18, 2022, 6:28 pm

Submit Option 2 for a base building with certification pending??

CI-v4.1 IPc1:Integrative Process
posted by  Erica Downs  on 

Our CI project would like to follow v4.1 Option 2: Select a LEED Certified Building.  The CI project is located in a LEED-registered C&S project, but the base building is sti

1
Thu Oct 17, 2019, 3:57 am

Filtered water faucet in Hotel Dwelling Units

NC-v4 WEp2:Indoor water use reduction
posted by     on 

I wrote a couple weeks back, with some questions on the "v4v4 1_Indoor Water Use Reduction Calculator."  I just discovered that the dwelling units will have two faucets, one for hand washing,

4
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1361 thumbs up
Tue Sep 24, 2019, 8:29 pm

Where to input SS credits in Arc?

LEED v4.1 Discussion Forum
posted by  Drew Hasenkamp  on 

In my Arc dashboard, under Credits/Actions, I'm only seeing "Data Input" and "Review" and nowhere do I see the option for submitting documents to earn the Sustainable Sites credits in v4.1.

0

Using Schools option 2 - Pedestrian Access for a Community Service Center

NC-v4 LTc4:Surrounding density and diverse uses
posted by  nancy picard  on 

Has anyone ever seen new construction projects where an exception was made for them to use Schools option 2  - Pedestrian Access even if applying for another type pf building?

1
Wed Sep 25, 2019, 2:28 pm

LRV for baffles

CI-v4 EQc6:Interior lighting
posted by  Carina Clark  on 

Curious the best way to calculate SF for spaces that have paint on the structure as well as baffles that hang below.

1
Fri Oct 4, 2019, 6:56 pm
0