Accounting for Sun Shade as view-preserving automated shades and North facing glazing -
NC-2009 IEQc8.1:Daylight and views - daylightposted by Edgar Arevalo on
Currently the VLTxWFR values for each regularly occupied space is higher than 0.18
Timelines for existing building retrofits
posted by Lindsay Ziegler on
I'm new to following the LEED standard, and I'm trying to estimate the costs and time for a retrofit of a multi-story office building, less than 100K square feet.
Option 2 - zone floor area calculation
CS-2009 IEQc8.1:Daylight and views - daylightposted by Edgar Arevalo on
When the LEED handbook instructs to calculate the zone floor area by multiplying the bay width with the bay depth to core, is the "bay depth to core" considered the distance from the wall (or windo
Option 4 for the Whole Building Life Cycle Assessment for 3 Credits using ATHENA.
Pilot-Credits MRpc63:Whole building life cycle assessmentposted by RICHARD ABRAHAMS on
Option 4 requires calculating impacts for both the Baseline Building and the Proposed Building in the following 6 categories:
When exactly to submit for this credit?
NC-v4 IPc1:Integrative processposted by Sayali G on
Hey All,
Phased project implementation
NC-2009 EAc5:Measurement and verificationposted by Tim Murray on
We have a phased higher education project in which a new building addition will be built first, then the existing buildings will be renovated and open a year later.
Service Water Heating DHW flow rate in the v4 Minimum Energy Performance Calculator
NC-v4 EAp2:Minimum energy performanceposted by on
We are working on a large hotel, and are concerned with the "Modeled DHW Flow Rate gallons/minute" results we are getting from the "Service Water Heating" portion of the calculator. We've dou
Base HVAC System for a Data Center / Server Room ASHRAE 90.1 - 2007
NC-2009 EAp2:Minimum energy performanceposted by Fatou Jabbie, | Technology | Design and Engineering Plan Reviews | Energy Code Compliance | Sustainability | LEED AP BD+C on
- Modeling a Data Center: 1,682.34 sq. ft.
- Call Center: 8,389 sq.
IPM Tracking Tool
EBOM-v4 EQc9:Integrated pest managementposted by Catalyst Partners on
The form requires teams to upload a "IPM Tracking Tool" which is not available on USGBC LEED Credit resources page or here on LEEDuser. Anyone know what it looks like or have it?
Concrete bonding agent below slab on grade
NC-v4 EQc2:Low-emitting materialsposted by Vandita Mudgal on
We have to use a strong concrete bonding agent below a 2 to 3" Slab on grade to stick with the concrete foundation below the structure.