PIf2 Site Characteristics for individual building project on a LEED Campus
Schools-2009 PIf2:Project Summary Detailsposted by Yasha Ogg on
I have a project that is getting built in two phases on a LEED Campus. The first phase includes the construction of a new 3-8 grade building.
How long after a project is completed can credits be submitted?
Healthcare-v4 INc1:Innovationposted by Stephanie Kreps on
If a new construction project is already registered in LEED online, can the credit submittal process begin after the building has been completed?
Are Shades 'Furniture and Furnishings'?
CI-v4 EQc2:Low-emitting materialsposted by Julie Hendricks on
Motorized and manual shades (such as Mechoshade) are in Division 12. Do they count as "stand-alone furniture items" that must be included in low-emitting materials calculations?
Appeal for denied credit
posted by Johnathan Woodside on
If a project has been submitted for review (Design prelim and Construction prelim) comments are received for each review.
Adding Green Energy points after final construction review
posted by Susan Di Giulio on
So we have a difficult v2009 project that strained to achieve simple certification. It came back from prelim construction review with only one comment.
Adding PV to a project AFTER Energy efficiency prelim has been accepted in Design Review
posted by Susan Di Giulio on
Hi,
exceptions for farmland?
NC-v4 LTc2:Sensitive land protectionposted by Erica Downs on
We have an infill site on a university campus. Unfortunately, this particular plot of land was previously undeveloped. When checking the soils survey site, a portion of the site comes u
APPA Room Type Definitions
EBOM-2009 IEQc3.2: Green cleaning - custodial effectiveness assessmentposted by Alexis Doyle on
Hello,
ROI for LEED at Healthcare Campus
posted by Barbara Hamilton on
Please share any reports or data that exemplifies the ROI of building and operating a LEED building, specifically for healthcare, i.e. Acute Care Hospital and Out Patient Pavillion.
SSpc41 Walkable Project Site
NC-v4 INc1:Innovationposted by Helene Lefkowitz on
Our project team pursued this pilot credit and found it to be very achievable for projects in urban settings.