BOD review from the BECx consultant
NC-v4 EAc1:Enhanced commissioningposted by Julie Trottier on
Good Morning,
Fixtures for Option 2 Lighting Quality, Strategy D.
NC-v4 EQc6:Interior lightingposted by Geoffrey Katz on
A recessed LED troffer type fixture may have an indirect light component by way of internal reflectors that reflect upward-directed light within the fixture back down onto the space below.
ID credit purchasing lamps - Copy of a legally binding tenant sales and lease agreement documentation
CS-2009 IDc1:Innovation in designposted by Edgar Arevalo on
So this statement is concerning, "Please note that since LEED O+M is a whole building rating system, when attempting an Innovation in Design point for following a LEED O+M prerequisite or credi
terrazzo in a performance spec situation
NC-v4.1 EQc2:Low-Emitting Materialsposted by Don Jones on
For a project like ours, for the US Army Corps of Engineers, our specs are non-proprietary.
2016 T24 energy code - v4_Minimum Energy Performance Calculator_v05 - how much of this needs to be completed
CI-v4 EAp2:Minimum energy performanceposted by Kevin Gilleran on
Hi,
Ending ESC Monitoring - what stage in construction?
NC-2009 SSp1:Construction activity pollution preventionposted by David Bell on
Hi, I'm curious whether the USGBC/CaGBC has a generally accepted endpoint to ESC monitoring on a construction project, or whether it is left to professional judgement. I.e.
Overventilation for Stack Effect
NC-v4 EAp2:Minimum energy performanceposted by on
I'm working on an energy model for a high-rise project in the Pacific NW that has office and residential, with residential being the top two-thirds of the building.
Renewable Energy unable to be commissioned due to delays, can we still submit for LEED review?
NC-2009 EAp1:Fundamental commissioning of building energy systemsposted by Rachel Manoguerra on
The project I am working on is "complete" and the owner wants to submit for final LEED review. However, the PV has been delayed and not installed on the project.
Monitoring-based Cx frequency of analysis and approach clarification
NC-v4 EAc1:Enhanced commissioningposted by Kevin Day on
LEED reference manual states "MBCx can be accomplished via systems submetering, operational points trending, and real-time analyses, such as fault detection and sequence verification."