Sun Aug 11, 2019, 10:01 pm

Fixtures for Option 2 Lighting Quality, Strategy D.

NC-v4 EQc6:Interior lighting
posted by  Geoffrey Katz  on 

A recessed LED troffer type fixture may have an indirect light component by way of internal reflectors that reflect upward-directed light within the fixture back down onto the space below.

2
Thu May 30, 2019, 2:54 pm

ID credit purchasing lamps - Copy of a legally binding tenant sales and lease agreement documentation

CS-2009 IDc1:Innovation in design
posted by  Edgar Arevalo  on 

So this statement is concerning, "Please note that since LEED O+M is a whole building rating system, when attempting an Innovation in Design point for following a LEED O+M prerequisite or credi

1
Fri May 31, 2019, 8:07 pm

terrazzo in a performance spec situation

NC-v4.1 EQc2:Low-Emitting Materials
posted by  Don Jones  on 

For a project like ours, for the US Army Corps of Engineers, our specs are non-proprietary.

2
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1361 thumbs up
Wed May 29, 2019, 11:49 pm
3
Default Avatar
president
Gilleran Energy Management, Inc.
LEEDuser Premium Member
18 thumbs up
Wed May 29, 2019, 7:00 pm

Ending ESC Monitoring - what stage in construction?

NC-2009 SSp1:Construction activity pollution prevention
posted by  David Bell  on 

Hi, I'm curious whether the USGBC/CaGBC has a generally accepted endpoint to ESC monitoring on a construction project, or whether it is left to professional judgement.    I.e.

0

Overventilation for Stack Effect

NC-v4 EAp2:Minimum energy performance
posted by     on 

I'm working on an energy model for a high-rise project in the Pacific NW that has office and residential, with residential being the top two-thirds of the building.

1
Wed May 29, 2019, 3:09 pm

Renewable Energy unable to be commissioned due to delays, can we still submit for LEED review?

NC-2009 EAp1:Fundamental commissioning of building energy systems
posted by  Rachel Manoguerra  on 

The project I am working on is "complete" and the owner wants to submit for final LEED review.  However, the PV has been delayed and not installed on the project.

3
Sat May 25, 2019, 4:37 am

Monitoring-based Cx frequency of analysis and approach clarification

NC-v4 EAc1:Enhanced commissioning
posted by  Kevin Day  on 