Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Onsite Apiary

Pilot-Credits SSpc82:Local food production
posted by  Stephen Ward  on 

Does having an apiary on our campus count towards the amount of area reserved onsite for food production?

1
Wed May 6, 2020, 11:33 pm

Calculating landscaping

NC-v4 SSc2:Site development - protect or restore habitat
posted by  Tracy Jordre  on 

My question is related to both the Protect or Restore Habitat and Open Space credits.  In the past I have included the total area of any landscaping bed, not just the area of each plant themse

1
Thu May 30, 2019, 12:04 am

Artificial Turf - Considered Hardscape?

NC-2009 SSc7.1:Heat island effect - nonroof
posted by  Marina Wrensch  on 

I am working on the LEED documentation for SSc7.1 for a softball stadium. The infield is clay and the outfield is artificial turf.

2
Senior Sustainability Manager
WSP
LEEDuser Expert
53 thumbs up
Fri May 24, 2019, 3:50 pm

Shared walls with another structure in baseline and proposed

NC-v4 EAc2:Optimize energy performance
posted by  Christine McKinley  on 

Hello, 

In my baseline model, can I show shared walls as exposed to exterior and then in my proposed model treat that wall as a partition? 

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Thu May 23, 2019, 10:13 pm

Major renovation to existing building - EQp1 requirements

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Navisa Jain  on 

We have a 6 storey addition to an existing 4-storeyed building. The mechanical systems for the addition are separate from the existing systems.

1
Fri May 31, 2019, 8:17 pm

Metering make-up water for geothermal system

NC-v4 WEc4:Water metering
posted by  Daniel Davis  on 

We are installing a meter onto the geothermal well water makeup water (due to evaporation/leakage) – will this count as the additional meter, under process water?

1
Thu Jun 27, 2019, 11:28 am

Integrative process charrette and ANSI book

NC-v4 IPc1:Integrative process
posted by  Kavita K  on 

Hi all,

We are pursuing a LEED for Schools project and are looking to get the Integrative process credit. Couple of clarifying questions -

1
Mon May 20, 2019, 9:19 pm
4
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Fri May 17, 2019, 2:31 am
2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Thu Apr 23, 2026, 10:39 am