Forum quick links
Meal program and workers
posted by Emily Neal on
Not sure how to best explain this so Im hoping if I give you the data, someone can help guide me in how im supposed to calculate this...
Efficient Refrigeration Equipment
CI-v4 EAc2:Optimize energy performanceposted by Michael Archer on
Under 'Further explanation - Exceptional Calculation method - Changes from earlier versions of ASHRAE and LEED', the CI reference guide states "All project types may count energy savings from effic
How to fill out the Credit form for IEQc1 for a 100% outdoor air system that does not require OA monitoring?
NC-2009 IEQc1:Outdoor air delivery monitoringposted by Nishank Shah on
I have a 100% OA ERU that operates constantly on an occupancy schedule. There is no Outdoor airflow monitoring device on the unit and no CO2 sensors for the densely occupied spaces.
How to fill out the Credit form for IEQc5 for a 100% outdoor air system that does not require OA monitoring?
NC-2009 IEQc1:Outdoor air delivery monitoringposted by Nishank Shah on
I have a 100% OA ERU that operates constantly on an occupancy schedule. There is no Outdoor airflow monitoring device on the unit and no CO2 sensors for the densely occupied spaces.
Averaging Thermostats - acceptable means for 50%?
NC-2009 IEQc6.2:Controllability of systems - thermal comfortposted by Mark Van on
I am working on a Healthcare building, and most of the spaces combine (3) rooms into a single temperature control zone, with the thermostat located in one of the rooms. Would adding (at least
General Emissions Evaluation for installation products
Schools-EBOM-v4 EQc1:Indoor air quality management programposted by Sara Axon on
For installation of millwork, our installer uses basic items: liquid nail, wood glue, silicone, spackle, etc.
Locker Rooms as Changing facilities
NC-2009 SSc4.2:Alternative transportation - bicycle storage and changing roomsposted by Ryan Christensen on
As I fill out the SSc4.2 credit form, I am having trouble reconciling my project into the changing facility vs. shower categories. The project has two large locker rooms with 100+ lockers.
BPDO Calculator
CI-v4 MRc3:Building product disclosure and optimization - environmental product declarationsposted by Christina Nontanovan on
Hello,
Book stack areas as non-regularly occupied?
NC-v4 EQc7:Daylightposted by Kavita Karmarkar on
Hi all,