Forum quick links
Lactation Room WEp1 Sink Calcs
NC-2009 WEp1:Water use reductionposted by Rob Hink on
We have a NC project that has a lactation room with a sink in the room of a cruise terminal. There will be 345 FTEs and 7,000+ Visitors on a daily basis.
WEc1 Thresholds Tab
NC-2009 WEc1:Water efficient landscapingposted by H M on
Within the WEc1 "Thresholds" tab, there is a green button that reads "Submit". Are you supposed to click this button in order for the credit to be ready for review?
IEQ Space Matrix?
NC-v4 EQp1:Minimum indoor air quality performanceposted by Erica Downs on
Is the IEQ Space Matrix still relevant for this Prereq under v4?
Historical Exemptions from Requirements
Pilot-Credits PC14:Walkable Streetsposted by Qiongwen Kong on
Has anyone had any experience with an exemption to a requirement due to a historical building or feature? This is regarding the requirement that no more than 30% of the primary façade can be witho
"CHECK FORM" doesn't work at the bottom of template IEQc5
NC-2009 IEQc5:Indoor chemical and pollutant source controlposted by H M on
I am unable to "CHECK FORM" at the bottom of my template IEQc5 in LEED online. The text "Incomplete.
Dwelling Unit Ventilation
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Boggarm Setty on
Hi, we are working on a residential building and filling out "Minimum IAQ performance" ventilation calculator.
Report multiple electric meters on Energy Star Portfolio Manager
NC-2009 PIf1:Minimum Program Requirementsposted by Edward Gulick on
I am (finally) wrapping up documentation on a multi-tenant building. It is a LEED-NC project because over 50% of the leaseable space is owner-occupied. The building has 4 electric
Insulated Metal Panel
NC-v4 EQc2:Low-emitting materialsposted by Erin Holdenried on
Any thoughts how an insulated metal panel would (or would not be included) in the credit for the Option 1 path? I assume is would not need to be included as it is a factory-finished metal pro
Previous Owner to Demolish Building Prior to Our New Owner Taking Control
NC-v4 MRp2:Construction and demolition waste management planningposted by Steven Blais on
Our client is negotiating to lease or acquire property to construct new facilities.
Documentation for Material Reuse?
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Megan White on
What is required for documentation of material reuse? In the Ref Guide (p.535), it says projects should track original location of the material before remove.