NC-v4 EQc6:Interior lightingposted by Christine Chow on
Are existing light fixtures required to be included in the calculations for both options?
The correct/latest 62MZ & LEED min. IAQ spreadsheet?
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Aru Sau on
Is "v2009v4_Minimum IAQ Performance Calculator_v03" spreadsheet is the correct/right one for a project registered in February 2016 in LEED 2009? Also, Is there any updated "62MZCalc.xls" (Revised A
Controllability in Gallery/Exhibition spaces
NC-v4 EQc6:Interior lightingposted by Elizabeth Powers on
Does anyone have experience or insight into achieving this credit in gallery or exhibition spaces?
Residence Hall 24 hour Use Spaces
NC-2009 SSc8:Light pollution reductionposted by Lisa Ferreira on
We have designed a residence hall that has single and double rooms on a double loaded corridor, with shared floor lounges and studies.
Preferred Parking Enforcement Requirements.
NC-v4 LTc8:Green vehiclesposted by Chris Brown on
Regarding the preferred parking, the credit requrements state "Clearly identify and enforce for sole use by green vehicles." (emphasis added).
Grid interactive charging stations
NC-v4 LTc8:Green vehiclesposted by Lawrence Lile on
- USGBC requires that electrical connectors must adhere to SAE Surface Vehicle Recommended Practice J1772, SAE Electric Vehicle Conductive Charge Coupler or an equivalent regional or local sta
Ventilation rates at unoccupied rooms
CI-2009 IEQp1:Minimum indoor air quality performanceposted by Stacey Olson on
This project is in California, and ventilation rates comply with Title 24.
NPDc8 - Option 2 / Define "Occupants"
ND-v2009 NPDc8:Transportation demand managementposted by Stacey Olson on
This option indicates transit passes must be provided to project "occupants". Are "Occupants" FTE, residents, or inclusive of 100% of people who come to the site?
Shop-applied primer/touch-up paint for field
NC-v4 EQc2:Low-emitting materialsposted by Shaunna Shaw on
I work for a structural steel contractor working on our first LEED v4 project and we are having difficulty getting our standard shop primer approved by the GC. The paint does not meet th
Office, conference room to Hallway, stairs STCc Interpretation
CI-v4 EQc9:Acoustic performanceposted by Jeffrey Fullerton on
In this credit, there is a requirement for an STCc 50 rating for "Office, conference room" to "Hallway, stairs".