Forum quick links
MR Credit - 20% of WHAT number for the cutsheets
NC-2009 MRc4:Recycled contentposted by Denise Domino on
What are going off of for the 20%? 20% Material Cost???
Movie Theater Visitor Classification
NC-2009 WEp1:Water use reductionposted by Norma Lehman on
Would patrons to the movie theater be classified as "transient" or "retail customer"?
SSc1 Path 12: EV Charging Stations
CI-2009 SSc1:Site selectionposted by Alaina Ladner on
How many EV charging stations are required to be provided to achieve this credit?
Thermal Comfort for Renovation of Historically Significant Building
NC-v4 EQc5:Thermal comfortposted by Heather Zeto on
Our project is a "Major Renovation" project for a historically significant buidling within a historic district.
Whether to include water on a roof in this calculation
NC-2009 SSc7.2:Heat island effect - roofposted by Sara Greenwood on
I have a project that has reflecting pools on part of the roof area and do not see any precedent for this in LEED User.
CI-2009 EA c1.3 Optimize Energy Performance HVAC
CI-2009 EAc1.3:Optimize energy performance - HVACposted by Jamal Anwar on
For Leed EA C1.3 calcs to comply with Core Perf Guide:
V2. LEED Recertification
posted by Jason Zielsdorf on
I have a project that recieved LEED BD+C: New Construction v2 - LEED 2.2 in 2014. They recieved a credit for water reduction with low flow toilets.
Site calculations for single building part of a larger complex
NC-v4 SSc2:Site development - protect or restore habitatposted by MICHAEL LOPEZ on
We have a five-acre site with multiple buildings. However, we are pursuing certification for only one of the buildings. Does the entire site have to meet the prerequisite?
EA-p2: EnergyStar TargetFinder Score
CI-v4 EAp2:Minimum energy performanceposted by Nikhilesh Srinivasan on
My project is an office tenant fitout (1 floor in a high-rise building).
PLF4 was not approved because ..& recommendation for final submi
NC-2009 PIf4:Schedule and Overview Documentsposted by Matt Dem on
Plf4 was not approved because GBCI is asking int & ext photos & renderings of the building. This was Design Preliminary submission and construction has just started.