Forum quick links
SSc1 Path 12: EV Charging Stations
CI-2009 SSc1:Site selectionposted by Alaina Ladner on
How many EV charging stations are required to be provided to achieve this credit?
Thermal Comfort for Renovation of Historically Significant Building
NC-v4 EQc5:Thermal comfortposted by Heather Zeto on
Our project is a "Major Renovation" project for a historically significant buidling within a historic district.
Whether to include water on a roof in this calculation
NC-2009 SSc7.2:Heat island effect - roofposted by Sara Greenwood on
I have a project that has reflecting pools on part of the roof area and do not see any precedent for this in LEED User.
CI-2009 EA c1.3 Optimize Energy Performance HVAC
CI-2009 EAc1.3:Optimize energy performance - HVACposted by Jamal Anwar on
For Leed EA C1.3 calcs to comply with Core Perf Guide:
V2. LEED Recertification
posted by Jason Zielsdorf on
I have a project that recieved LEED BD+C: New Construction v2 - LEED 2.2 in 2014. They recieved a credit for water reduction with low flow toilets.
Site calculations for single building part of a larger complex
NC-v4 SSc2:Site development - protect or restore habitatposted by MICHAEL LOPEZ on
We have a five-acre site with multiple buildings. However, we are pursuing certification for only one of the buildings. Does the entire site have to meet the prerequisite?
EA-p2: EnergyStar TargetFinder Score
CI-v4 EAp2:Minimum energy performanceposted by Nikhilesh Srinivasan on
My project is an office tenant fitout (1 floor in a high-rise building).
Re-using existing building as outdoor amphitheater
NC-v4 MRc1:Building life-cycle impact reductionposted by Jeff Denno on
Hello, We are working on a New Construction project where they plan to keep 25% of the existing brick wall from the existing building in-tact for an outdoor amphitheater that is not attached to th
Pre-Owned furniture
CI-2009 MRc4:Recycled contentposted by Susan Di Giulio on
If a project is using less than 30% of the furniture budget's worth of pre-owned furniture, and thus not attempting MRc3.2, can that be used towards MRc4 instead?
ACP / developer control percentage penalizes existing buildings?
CS-2009 EAp2:Minimum energy performanceposted by Jareb Ketay on
I've done a number of Core and Shell models before, and always use the ACP calculator.