Forum quick links
Envelop Commissioning
CI-v4 EAp1:Fundamental commissioning and verificationposted by Peter Doo on
The LEED Online template provides selections for HVAC systems commissioning (4pts) or commissioning with monitoring (5pts). The LEED Reference Guide describes Enhanced Systems Commissioning (3-4pts
Default Space Susage Types - are there definitions?
CI-2009 PIf3:Occupant and Usage Dataposted by Stacey Olson on
I have a building which is permitted as B occupancy (office), which provides services to outpatients, but does not diagnose or exam. Is there a definition of "Medical Use" I can refer to?
EPD Option 2 - Compliance
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Alexa Stone on
For Option 2 - How do you determine credit compliance with an industry-wide EPD?
Maximum frontage without windows on primary facade
Pilot-Credits PC14:Walkable Streetsposted by Margaret Montgomery on
The project I'm testing this pilot credit with meets all but requirement 8, so the pilot credit has been "met".
Combined Purchasing
EBOM-2009 MRp1:Sustainable purchasing policyposted by Ryan Hoffman on
The project in question is the north building of a 2-building, 1 million sf facility.
Pre-Rinse Spray Valves in Laboratories
NC-2009 WEp1:Water use reductionposted by Wyatt Suddarth on
I have several pre-rinse spray valves that were specified by an external laboratory consultant in a college laboratory building that do not appear to meet the requirement of being less than or equa
Thermostats with humidity and CO2
NC-2009 IEQc7.2:Thermal comfort - verificationposted by Kristopher Lashley on
Hello all and a happy new year, I am wondering if anyone knows of a thermostat that can also measure and display humidity and CO2 levels? We are trying to find a way to cut down on the number of s
Apparatus bay of Fire Department
NC-2009 IEQc3.2:Construction IAQ management plan - before occupancyposted by Laura Charlier on
HI there, Would the apparatus bay of a fire department need to be included in the building flush-out? I see a typical garage would not need to be included but this isn't a typical garage.
Air economizers in proposed and baseline
NC-2009 EAp2:Minimum energy performanceposted by Jeff Riggs on
If air economizers are not required to be modeled in the baseline system due to climate zone (4a) can you model the proposed with economizers if in design and not model economizers in the baseline?
Glazing Materials
Pilot-Credits SSpc55:Bird collision deterrenceposted by Lindsey Hinni on
I was just wondering if anyone else has used the Ornilux Bird Protection Glass on their projects. If so - have you found it to be as effective as you thought it would be?