Forum quick links
PPB to UG/M3 in ArcSkoru
EBOM-v4.1 EQp4:Indoor Environmental Quality Performanceposted by Karen Goering on
Reporting TVOC in ArcSkoru my instrument only measured in ppb but need to report in ug/m3.
Anti-Ligature Plumbing Fixtures
Healthcare-v4 WEp2:Indoor water use reductionposted by Bethany Beers on
Hello, has anyone had an success getting an exemption or exclusion on the WaterSense requirements for anti-liguature fixtures in an in-patient mental health facility?
Biophilic Design: Quantifiable Metrics
Pilot-Credits EQpc123:Designing with Nature, Biophilic Design for the Indoor Environmentposted by LEED Team DC on
Hi, I'm wondering if there are shareable examples of a project team documenting quantifiable biophilic metrics.
Exemplary Performance
NC-v4.1 EQc4:Indoor Air Quality Assessmentposted by Peter Downar on
The BD+C v4.1 guide states that "Exemplary performance is available for projects that test for the additional target volatile organic
Requirement for sequence of operations for systems not part of a BAS?
EBOM-v4.1 EAp1:Energy Efficiency Best Management Practicesposted by Stephen Ward on
Are we required to submit a sequence of operations for HVAC systems that are not part of the building's automation system?
Adding a Level to a LEED O&M Certified Building
posted by Patty Lloyd on
I was asked to create a LEED CS Scorecard for a project that is an addition of a floor added to the top of an existing multi-story LEED O&M certified building.
Soil stockpiling over the winter
NC-v4 SSp1:Construction activity pollution preventionposted by Scott Beckman on
We have a correctional project where we are doing some of the sitework now but the project work will be paused over the winter.
Weekend trip counts for Office Location
CS-v4 LTc5:Access to quality transitposted by Andy Rhoades on
Hi there,
Project pertaining to only the third floor of a building
CI-v4 EAc2:Optimize energy performanceposted by Peter Downar on
- The project pertains to a fit-up of only the 3rd floor of a multi-floor building.