Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Option 2. financial support

NC-v4 SSc2:Site development - protect or restore habitat
posted by  Theresa Lehman  on 

Has anyone achieved this credit for a government entity such as a municipality, where the government entity has provided a financial budget to restore greenway space, waterways, etc.

0

Stakeholder Engagement

Pilot-Credits INpc122:Informing Design by Major Credit Category Using Triple Bottom Line Analysis
posted by  Mansoureh Jalali  on 

What strategies or best practices can help project teams engage stakeholders in the Triple Bottom Line analysis to ensure diverse perspectives and comprehensive results?

3
Tue May 26, 2026, 5:53 pm

Autocase Updating for LEED v5?

Pilot-Credits INpc113:Informing Design Using Triple Bottom Line Analysis
posted by  Candice Rogers  on 

Hello!  Was interested to see if anyone knew whether Autocase will be upgrading the LEED credit report for v5 inputs?

0
9
Thu May 21, 2026, 7:33 am

Trees sf calculation for Protect or Restore Habitat v4.1

NC-v4.1 SSc2:Protect or Restore Habitat
posted by  Maya Facciolo  on 

How do we calculate the square footage for contiguous trees for Protect or Restore Habitat v4.1?

1
Ecological Design Consultant
Bio Studio
LEEDuser Premium Member
0 thumbs up
Thu May 14, 2026, 5:59 pm

Above ground storage tanks

NC-v4 LTc3:High priority site
posted by  Samuel Calhoun  on 

A project I am working on had (QTY: 27) above ground storage tanks removed from the site. This work was overseen by a 3rd party consultant, permitted by the local AHJ, and registered with the DEP.

1
Wed May 13, 2026, 12:24 pm

Documentation for Inherently non-emitting materials

NC-v4 EQc2:Low-emitting materials
posted by  Edgar Arevalo  on 

We have an insulation material that can comply either as inherently non-emitting or meets general emissions evaluation, and has been checked as inherently non-emitting by the contractor,

11
Mon May 11, 2026, 4:09 pm

Design for Indoor Air Quality and Infection Control Documentation

Pilot-Credits INpc155:Design for Indoor Air Quality and Infection Control
posted by  Katherine Tich  on 

Anyone with experience documenting this credit - did you submit with the design credits or with the construction credits?

3
Fri Apr 17, 2026, 11:06 am

50% of Receptable Controls to meet the Prerequisite

NC-v4 EAp2:Minimum energy performance
posted by  Kritika Kharbanda  on 

We are working on a project where it was missed during equipment procurement that open office furniture is required to have 50% of the receptacles controlled to meet the prerequisite under 90.1-201

1
Senior Energy Wizard
TLC Engineering Solutions
LEEDuser Basic Member
44 thumbs up
Mon Apr 13, 2026, 11:55 pm