Option 3: Design for Flexibility, Plug-and-play lighting controls
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Crista Shopis on
I'm exploring this as a 3rd option for the Interiors Life-cycles credit but I have not found a example in these forums of this option being included in a successful submission.
Option 3 flexible lighting control system required documentation
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Alara Brinton on
I'm not entirely sure what the LEED online form/template means in regards to calculations for flexible lighting control system.
Interior element reuse in different project
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Nadia Azzam on
Our project is demolishing a wall partition which is going to be reused on a different project (not the one applying for LEED).
Interior Reuse - is pipework and air duct Interior non structural elements?
CI-v4 MRc2:Interiors life-cycle impact reductionposted by shashank gangil on
We are doing a LEED CI V4 project. The client will use existing air duct, diffuser, grilles, provided by the landlord and AC chilled water pipe.
Calculations for demountable partitions
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Marie Miller on
I'm working on a TI project and we're trying to get the Design for Flexibility point. When calculating for this credit, do we use linear feet or square feet of the product?
Design of flexibility - Can an open ceiling be counted as an accessible ceiling?
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Michael on
Option 5 - 50% recyclable content by cost
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Anna McGee on
How does one prove that "...
Required documentation - credit form versus reference guide
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Dee Spiro on
I'm posing this question under this particular credit, but it's actually applicable to a number of credits in a number of the rating systems. For this credit, the credit form includes th
If bare raised floor is covered with carpet - is it reused?
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Diana Nezamutinova on
1. In our fit-out project in London the base building provides raised access floor that cannot be used as is due to acoustic and aesthetic reasons.
Interior reuse calculation, What is counted?
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Mark Ragucci on
Our project is on the second floor of a 3 story building. To start the space has had finishes removed for hazardous abatement before construction demo.