Rainwater management for large industrial site

NC-v4 SSc4:Rainwater management
posted by  Erin Holdenried  on 

Hello - We have a large industrial site that is using a pond to manage about 25% of the rainwater and a vegetated channel to manage about 75% of the rainwater.  I believe the vegetated channel

2
Thu May 21, 2026, 12:19 am

Above ground storage tanks

NC-v4 LTc3:High priority site
posted by  Samuel Calhoun  on 

A project I am working on had (QTY: 27) above ground storage tanks removed from the site. This work was overseen by a 3rd party consultant, permitted by the local AHJ, and registered with the DEP.

1
Wed May 13, 2026, 12:24 pm

Documentation for Inherently non-emitting materials

NC-v4 EQc2:Low-emitting materials
posted by  Edgar Arevalo  on 

We have an insulation material that can comply either as inherently non-emitting or meets general emissions evaluation, and has been checked as inherently non-emitting by the contractor,

11
Mon May 11, 2026, 4:09 pm

Kitchen faucet nominal flow rate vs maximum flow rate

CI-v4 WEp1:Indoor water use reduction
posted by  shashank gangil  on 

We are doing a CI project in Hong Kong and going to select a kitchen faucet for installation in the pantry.

4
Sustainability Director, Certifications & Compliance
Jacobs
LEEDuser Expert
469 thumbs up
Mon Apr 27, 2026, 6:55 pm

Counting Dimmable Luminaires

CS-v4 SSc6:Light pollution reduction
posted by  Helen Biersack  on 

for a project in lighting zone 3 (U3 allowance or 500 UL and 500 HL for total of 1000), I am reviewing a submittal for a light with the following performance data:

1
Sr. Electrical Engineer
Integrated Design Solutions
LEEDuser Expert
516 thumbs up
Fri Apr 24, 2026, 5:54 pm

50% of Receptable Controls to meet the Prerequisite

NC-v4 EAp2:Minimum energy performance
posted by  Kritika Kharbanda  on 

We are working on a project where it was missed during equipment procurement that open office furniture is required to have 50% of the receptacles controlled to meet the prerequisite under 90.1-201

1
Senior Energy Wizard
TLC Engineering Solutions
LEEDuser Basic Member
44 thumbs up
Mon Apr 13, 2026, 11:55 pm

Comprehensive Composting

NC-v4 INc1:Innovation
posted by  Alma Evans  on 

Hi there, I registered the project I worked on in Austin, TX - Govalle Elementary School for the comprehensive composting pilot innovation point and I want to thank AISD for providing the requ

3
Mon Apr 13, 2026, 2:55 pm

Applicability of Rainwater Management Credit – Direct Discharge to Natural Stream

NC-v4 SSc4:Rainwater management
posted by  Ahmed Alyousef  on 

We are seeking clarification on the applicability of the Rainwater Management credit based on our current stormwater strategy.

0

Use High Priority Site as Innovation

CS-v4 LTc3:High priority site
posted by  Sara Johansson  on 

Hello, I have a CS v.2009 project and wish to use the High Priority v.4 credit as an innovation credit.

3
Sustainability Director, Certifications & Compliance
Jacobs
LEEDuser Expert
469 thumbs up
Fri Apr 10, 2026, 5:50 pm