Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Hot-water design supply and return temperature difference

CS-v4 EAp2:Minimum energy performance
posted by  Przemysław Rejczak  on 

Dear Everyone,

I got a comment for one of our project which in my opinion is not ccompatibe with ASHRAE. We do not have much time for the response, so I decided to ask about it here.

1
Thu Mar 4, 2021, 8:34 pm

Fire Alarm System components and other facility services subgroups systems

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Aaron McEwin  on 

Previous versions of LEED stipulated the Material and Resource Credits only applied to Divisions 2-10 products. 

1
Mon Feb 22, 2021, 3:12 pm

Fire Alarm System components and other facility services subgroups systems

NC-v4 MRc2:Building product disclosure and optimization - environmental product declarations
posted by  Aaron McEwin  on 

Previous versions of LEED stipulated the Material and Resource Credits only applied to Divisions 2-10 products. 

1
Mon Feb 22, 2021, 2:56 pm

Advanced Energy Metering, Opt.2 - Data Must Be Remotely Accessible

CI-v4 EAc3:Advanced energy metering
posted by  Graeme Smith  on 

We under that... "The data must be remotely accessible"... but how does USGBC define remote accessibility?

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Mon Feb 22, 2021, 9:55 am

Pilot Credits: Safety First - Cleaning and Disinfecting; Re-enter Your Workplace

NC-v4 INc1:Innovation
posted by  Bethany Beers  on 

We interpreted the intent of these two COVID-related pilot credits to be: provide a safe working environment during construction.

0

Base building versus tenant metering

CS-v4 EAp3:Building-level energy metering
posted by  Jens Apel  on 

Maybe I am overly cautious, but I would like to clarify the following.

4
Fri Feb 19, 2021, 3:35 pm

Carpool Hours

NC-2009 SSc4.4:Alternative transportation - parking capacity
posted by  Sadie Martin  on 

Hi, has anyone has success with noting the carpool stalls are only used during certain hours of the day (like during typical office hours)?

5
Fri Feb 19, 2021, 3:04 pm

Default contract length for renewable energy procurement

NC-v4.1 EAc5:Renewable Energy
posted by  Bryna Dunn  on 

Under the definitions of Tier 1, Tier 2, and Tier 3, there is a statement that reads: "The default contract length for renewable energy procurement is 10 years.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Fri Feb 19, 2021, 2:39 pm

Partial "Lumens above Horizontal" calculation

NC-v4 SSc6:Light pollution reduction
posted by  Jack Ma  on 

Anyone have experience documenting an uplight light fixture with a permanent structure above for “partial lumens above horizontal” calculation, please let me know

2
Sr. Electrical Engineer
Integrated Design Solutions
LEEDuser Expert
516 thumbs up
Thu Feb 18, 2021, 8:54 pm