Forum quick links
Vegetation Types
NC-v4.1 SSc3:Open Spaceposted by Tim Nabholz on
Per V4.1 BD+C beta guide "25% of the minimum 30% total outdoor space requirement must be planted with two or more types of vegetation".
Pilot credit EQpc44 - Ergonomist Specialist
Pilot-Credits EQpc44:Ergonomics approach for computer usersposted by Maria Dolores Juri on
Hello,
Our project is pursing LEED BD+C v4 EQpc44.
I have a question regarding the ergonomic specialist hired to design an ergonomic strategy for the project.
Students (K-12) in ocupancy table for WE calcualtions
Schools-NC-v4 WEp2:Indoor water use reductionposted by Micaela Smulevich on
BPDO EPD Construction process Submittals
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Chyanne Husar on
We work with architects and contractors to prepare their LEED documentation and our projects require a separate LEED submittal process from Contractor to AOR. On the contractor side, we are s
planters on terraces
NC-v4 WEp1:Outdoor water use reductionposted by Agnieszka Rylska on
Can anyone confirm if planters located on the terraces should be included in the calculations for this credit?
Implementation Guide - CEU Credit
Pilot-Credits MRpc103:Integrative Analysis of Building Materialsposted by Todd Sims on
This group might be interested to know that there is a webinar designed to help project teams achieve this credit.
roof under ventilation ducts and glass overhang
NC-v4 SSc5:Heat island reductionposted by Agnieszka Rylska on
I have two questions regarding heat island reduction credit:
Transients per CS Appendix 1 / WE calculator
CS-2009 WEp1:Water use reductionposted by Aaron McEwin on
Hello everyone,
Location of the recycling bins
Retail-CI-v4 MRp1:Storage and collection of recyclablesposted by Ricardo Filho on
Hi all;
I have a project at concept phase and we are determining the location of the bins;
Documentation Required for IP Credit
Schools-NC-v4 IPc1:Integrative processposted by Cora Kenrick on
Hi Fellow LEED Users,
Has anyone submitted this credit yet and what documentation is required.
I'm new to LEED and this credit.