Forum quick links
Forum
Topic
Replies
Recent
LEED v4.1 O+M: Waste Performance
EBOM-v4.1 MRp3:Waste Performanceposted by Daniel Esposito on
I am currently working on a recertification project that was originally certified under LEED Core & Shell.
0
EV Vehicle Signage and ability to combine with Handicap Parking
NC-v4.1 LTc8:Electric Vehiclesposted by Summer Gorder on
We have a County project that would like to combine EV with Handicap parking. Can that contribute toward the 5%?
0
Acceptability of >300 Setpoint Not Met Hours in High Equipment Load Rooms (e.g., UPS Battery Rooms) – Airport Project
NC-v4 EAp2:Minimum energy performanceposted by Anurag Ghosh on
Hello everyone,
1
Thu Jul 3, 2025, 7:46 pm
IPpc98 feasibility for USACE projects
Pilot-Credits IPpc98:Assessment and Planning for Resilienceposted by Alison Kerr on
The credit can be documented and achieved for USACE projects, and it is in line with Army customer increased attention to resilience.
0
IPpc98 feasibility for USACE projects
Pilot-Credits IPpc98:Assessment and Planning for Resilienceposted by Alison Kerr on
The credit can be documented and achieved for USACE projects, and it is in line with Army customer increased attention
1
Thu Aug 28, 2025, 3:09 pm
Clarification on ASHRAE 90.1-2010 Scope for External Equipment
NC-v4 EAc2:Optimize energy performanceposted by Anurag Ghosh on
Hi everyone,
6
Wed Jun 25, 2025, 1:05 am
Renewable Energy Credit Interaction with updated Mininum and Optimize Energy Performance
NC-v4 EAc2:Optimize energy performanceposted by Camilo Velez on
Hi all,
1
Thu Jul 3, 2025, 7:32 pm
Submitting Minimum Energy Performance Data for Multiple Buildings in LEED Campus Group Approach
CS-v4 EAp2:Minimum energy performanceposted by Alvaro Twose on
Hello LEED colleagues,
11
Mon Jun 23, 2025, 8:17 pm
Prevention through Design - BOD e OPR
Pilot-Credits IPpc93:Prevention through Designposted by Adriana Hansen on
Hello,
2
Thu Jun 19, 2025, 9:30 pm